Cable plans

Our interactive cable plans visualize and connect all important and desired components with our hold-open systems and swing door operators.

We make it easy for you:

The prepared cable plans can be customized. After specifying all components, you can generate and print a PDF of your cable plan.

Cable diagram EFR III

Cable diagram
Cable diagram
 
NYM 3 x 1.0 mm²
 
NYM 3 x 1.5 mm²
 
(integrated)
 
J-Y(ST)Y 4 x 0.8 mm²
 
Specification from the manufacturer of the fire alarm system
 
(Clarify installation position with the door manufacturer)
12345BMZ / RWA6788.1
 
1. 230 V AC supply voltage (50/60 Hz)
 
2. Lintel-mounted smoke detector
(integrated)
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
 
8.1. Anchor plate
(Clarify installation position with the door manufacturer)
 
Additional data
 
 
 
 
 
 

Cable diagram SR-EFR III

Cable diagram
Cable diagram
 
NYM 3 x 1.0 mm²
 
NYM 3 x 1.5 mm²
 
(integrated)
 
J-Y(ST)Y 4 x 0.8 mm²
 
Specification from the manufacturer of the fire alarm system
 
(Clarify installation position with the door manufacturer)
GFSF12345BMZ / RWA67888.18.1
 
1. 230 V AC supply voltage (50/60 Hz)
 
2. Lintel-mounted smoke detector
(integrated)
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
J-Y(ST)Y 4 x 0.8 mm²
 
8.1. Anchor plate
(Clarify installation position with the door manufacturer)
 
Additional data
 
 
 
 
 
 

Cable diagram ETS 42 single-leaf

Cable diagram
Cable diagram
 
NYM 3 x 1.5 mm²
 
J-Y(ST)Y 4 x 0.6 mm²
 
J-Y(ST)Y 4 x 0.8 mm²
 
Cables through ECO
123455.166.177.189
 
1. Voltage supply
NYM 3 x 1.5 mm²
J-Y(ST)Y 4 x 0.8 mm²
Cables through ECO
Cables through ECO
J-Y(ST)Y 4 x 0.8 mm²
 
9.1.
 
9.2.
 
Additional data
 
 
 
 
 
 

Cable diagram ETS 73 single-leaf

Cable diagram
Cable diagram
 
NYM 3 x 1.5 mm²
 
J-Y(ST)Y 4 x 0.6 mm²
 
J-Y(ST)Y 4 x 0.8 mm²
 
Cables through ECO
123455.166.177.189
 
1. Voltage supply
NYM 3 x 1.5 mm²
J-Y(ST)Y 4 x 0.8 mm²
Cables through ECO
Cables through ECO
J-Y(ST)Y 4 x 0.8 mm²
 
9.1.
 
9.2.
 
Additional data
 
 
 
 
 
 

Cable diagram ETS 42 double-leaf

Cable diagram
Cable diagram
 
NYM 3 x 1.5 mm²
 
included in the ECO scope of supply
 
J-Y(ST)Y 4 x 0.6 mm²
 
J-Y(ST)Y 4 x 0.8 mm²
 
with 4 x 0.6 mm² E-opener
 
Cables through ECO
GFSF13.132456788910111212.11313.11415
 
1. Voltage supply active-leaf (GF)
NYM 3 x 1.5 mm²
NYM 3 x 1.5 mm²

Door coordinator
included in the ECO scope of supply

(system cable)

Laying to master
J-Y(ST)Y 4 x 0.8 mm²

Laying to master

for E-opener and RSK

for safety elements
with 4 x 0.6 mm² E-opener

Laying to slave
Cables through ECO

Laying to master – GF laying to slave – SF
Cables through ECO

Laying to slave – SF laying to master – GF

Laying to slave

Laying to slave

Laying to slave

Laying to slave

Laying to slave
J-Y(ST)Y 4 x 0.8 mm²

Laying to slave
 
15.1.
 
15.2.
 
Additional data
 
 
 
 
 
 

Cable diagram ETS 73 double-leaf

Cable diagram
Cable diagram
 
NYM 3 x 1.5 mm²
 
included in the ECO scope of supply
 
J-Y(ST)Y 4 x 0.6 mm²
 
J-Y(ST)Y 4 x 0.8 mm²
 
with 4 x 0.6 mm² E-opener
 
Cables through ECO
GFSF